Industrial / Manufacturing

Amcol Additrol Plant


Shell Rock, IA

This greenfield project on a seven-acre site included the construction of five buildings and one out exposed structure that possess a rail load out; warehouse/office; raw product storage/blending; milling building; coal storage; and open truck load out structure.

Services Performed:
  • Concrete Installation
  • Equipment Install
  • Structural Steel Erection
Team
Kevin Grittner
Director of Industrial & General Manager
763.443.6897
Gerald Leukam
Vice President, Design Services
763.694.7910
Humberto López
Executive Vice President, Industrial
904.323.3577

Related Projects