Commercial / Distribution

Pella Macomb Manufacturing Facility


Macomb, IL

The Weitz Company provided preconstruction and construction services on this new, 300,000-square-foot manufacturing, warehouse and office facility. Features included a steel frame with insulated precast walls with brick, EIFS and precast used for skin. Weitz also provided interior finishes with the installation of mechanical/electrical for the paint line and the concrete and structure for the sawdust containment area.

Services Performed:
  • Concrete Foundation
  • Electrical Installation
  • Insulated Precast Walls
  • Mechanical Installation
  • Structural Steel Erection
Team
Kevin Grittner
Director of Industrial & General Manager
763.443.6897
Gerald Leukam
Vice President, Design Services
763.694.7910
Humberto López
Executive Vice President, Industrial
904.323.3577

Related Projects