Burullus Power Plant

Burullus, Egypt

The Burullus Power Plant, a partner in consortium with Siemens, consists of the design; engineering; fabrication; delivery of materials and equipment; erection; testing; commissioning; startup; and putting into service the facility, which will have a total capacity of 4,800 megawatts at ISO condition. Orascom Construction’s scope includes carrying out all the engineering, procurement, construction, start-up and commissioning works for the balance of plant.  Additionally, Orascom is responsible for all the civil and erection works.