featured image syngenta seed

Syngenta Seeds

Pasco, WA

A design-build sweet corn and small seeds facility with warehouse, plant office, fumigation, seed conditioning, cob loadout and harvest space complex located on a 40-acre site.  The harvest complex included green corn receiving, husk and sort, dryer, seed conditioning, and chopper building.  The seed conditioning area of the facility consisted of parent seed and small vegetable sizing lines; sweet corn shelling line; dust control system; multiple conditioning lines; as well as treating and packaging lines.  In addition, Weitz provided relocation and ins tallation of conditioning and conveying equipment from two existing facilities.

Client:

Syngenta Seeds, Inc.

Square Feet:

125,000+, Multiple Buildings